On Tuesday we drove again to Townsville, this time to attend a pre-Christmas pizza-and-pool party for new residents, and to inspect progress on the house. The weather was fine, sunny, and hot, though not excessively humid. We enjoyed meeting more of the residents (and collecting the latest gossip); the pizza was good too.
Afterwards, we drove around the established part of the community (the "east side"), collecting ideas on window coverings and garden treatments.
The next day we inspected our house, located on the "west side" (also known colloquially as the "far side"—a designation we quite like). We noted that driveway had been poured 2 days before, the kitchen cabinets were in, the roof ventilation and solar hot-water panel was in, final bits of tiling were in progress, and there was still no evidence of airconditioning going to be installed in the 2nd and 3rd bedrooms, as specified. I queried this point and this morning received a call to say "yes, it will be done!"
Here are two more pictures. The first is taken from the other (eastern) side of what will be a landscaped park; the arrow marks our house. Projected completion date is now early January, weather permitting, but we're in no hurry.