03 October 2007
Marina construction update
Most of the water has now been pumped out of the enclosed area and the mud is drying. As these photos show, digging equipment is removing the mud from some areas and dumping it in other parts of the site. Under the gray mud (which varies in depth) is a layer of clay or other (brown) dirt, which is being used to construct access roads (probably temporary). Lots of dust and noise is coming from this work. It's slightly better than the pounding noises when the metal barriers were being hammered into the dirt, but the beep-beep-beep of the backup warning signals on the trucks and other equipment is seriously tedious.