01 May 2008

Marina construction update

Although I complain about the noise and dust from the marina construction, it's often very entertaining. Yesterday was better than a 5-ring circus. In addition to the usual collection of diggers filling trucks with dirt to be taken from one part of the site to another, we had: a series of trucks delivering drainage pipes, sand, gravel, rolls of plastic, large boulders, and other constructions materials; two large diggers creating a big trench in the previously-flattened area and other equipment planting drainage pipes in the trench; trees being removed and preparations made for shifting the site offices to another part of the site; and—in the center ring!—the display and sales office (about the size of a 3-bedroom house) being moved several hundred yards to its new location. The latter process took all day and included 8 or 10 helmeted people peering intently under the building as it was jacked up and a huge flatbed truck moved underneath it, then a heavy tractor was attached by a chain to the front of the truck and hauled it part of the distance (probably a slight slope was involved and the truck couldn't cope on its own), after which the truck drove the rest of the way and made a complicated 5-point turn to get the building oriented as they wanted it, and finally—just before sunset—it was moved into position. This morning they reinstalled the jacks, removed the truck, and have now lowered the building to rest on concrete pads under the stumps. We have photos of the whole process; I hope to get them into an album and online soon.